Uncategorized

Residents Should Watch For Water Tower Info In The Mail

Residents in the Roosevelt Street and Peru Road area should keep an eye out for a postcard from the City regarding the new Roosevelt Street water tower. The new water tower is complete, and affected residents in the service area will be receiving a postcard with some recommended steps to take before the switch is made. Activation of the new tower and related distribution system improvements is scheduled for the week of December 14.